GEYA G2R Din Rail 2P 4P ATS Dual Power Automatic Transfer Switch Electrical Selector Switches Uninterrupted Power 63A 110V 220V
Return&refund policy
Eligible items are covered by return and refund support. If the item does not arrive or is not as described, the buyer can request help.
Security & Privacy
Safe payments: We do not share your personal details with any third parties without your consent.
Secure personal details: We protect your privacy and keep your personal details safe and secure.
AI offer for your market
A curated pick based on category, shipping route, delivery speed and popularity in your selected market.
Why this product fits your market
- • Strong customer signal: 4.9★ from 834 reviews.
- • Recommendations focus on this product category and your market availability.
Product specifications
Detailed product description
This product is shown with available options, market-specific pricing and verified specifications.
- Brand: GEYA
- Sales: 900+
- Package size: 15 × 12 × 10 cm
- Package weight: 0.65 kg
- Rating: 4.9 / 5
Before adding to cart, choose an available option and check the quantity.
GEYA G2R Din Rail 2P 4P ATS Dual Power Automatic Transfer Switch Electrical Selector Switches Uninterrupted Power 25A 40 63A 110V/220V
City Power ⇆ Generator
G2R ATS Usage Precautions
1. 220V ATS should not be used with a voltage lower than 185V, otherwise the coil may burn out.
2. 110V ATS should not be used with a voltage lower than 90V, otherwise the coil may burn out.
3. The switch cannot be manually switched when in automatic mode, otherwise the coil may burn out.
3. 4P ATS ensure correct connection of phase sequence,otherwise the contacts may burn out.
General
GEYA G2R-63 automatic transfer switch is a PC class infrequent change-over switch, with two-station design (commonly used for A and standby for B), suitable for AC systems with AC 50-60hz and rated current 6A-63A. The main function of the automatic transfer switch is when the main power (common power supply A) fails, the ATS will automatically switch to the backup power (Backup power supply B) to continue working (switching speed
When both A and B have electricity, priority is using A Power
NOTE
2, Normally, pull the selector switch to the electric position. When manual operation is required, pull the selector switch to the manual position. After manual operation is complete, pull the selector switch from the manual position to the automatic position.
The control circuit TSE is immediately energized. After the change over is completed, the internal switch will damage the coil in the control circuit, and the coil can work normally at 85%-110% of the rated operating voltage. Too low input voltage may cause the coil to overheat and burn out.
Attention!When manual operation the mode selection switch must be in "manual" position
Company Information